Triple Stick Golf Club is one of the more design-specific projects attached to PGA National Resort, because the plan is not simply a course refresh. As of November 8, 2026, the supplied public sources describe a fully redesigned 18-hole, par-70 course scheduled to open in late fall 2026, with a separate 11,000-square-foot clubhouse planned for completion in 2028. The official project page gives the opening window, par, hole count, and clubhouse timing on the PGA Members Club page.
That timing matters for analysis. Late fall 2026 is not a precise opening date, and the supplied materials do not include a separate opening-day notice. For that reason, the safest reading is that the golf course was planned for late-fall availability, while the supporting clubhouse program was on a longer schedule. The course design notes, though, are already specific enough to assess the intended playing experience.
Triple Stick Golf Club Routing And Identity
The Former Estates Course Framework
The project follows the routing of the former Estates Course while retaining much of the existing landform. That is a meaningful design choice. A complete rerouting can erase familiar corridors, change infrastructure needs, and alter how water hazards relate to play. Here, the stated plan preserves all existing lakes and much of the site character while changing the strategic and visual treatment around those features.
From a course-design standpoint, keeping lakes in place can be both a constraint and an opportunity. It limits how far certain corridors can move, but it gives the architect fixed reference points for angles, carry lines, and recovery zones. Water that already shaped the old course can become sharper in the new one if tee placement, bunker position, fairway width, and green orientation are reset around it.
Why Closing Par 5s Matter
One of the more unusual planning notes is that both nines are set to end with par-5 holes. On a par-70 course, that choice affects rhythm. Many par-70 layouts reduce par by trimming par 5s or compressing the set of scoring holes. Ending each side with a par 5 creates a different cadence: players finish the front and back with a hole that can invite a decision between position and reach.
That does not automatically make the closing holes easier. A par 5 bordered by water, angled bunkers, or firm edges can ask for three controlled shots rather than one heroic swing. The research does not provide yardages or hole-by-hole diagrams, so any claim about scoring difficulty would be premature. What can be said is that the routing choice gives the design team two natural pressure points at the end of each nine.
Architectural Features Planned For Play
Railroad Ties, Walls, And Visual Edges
The project materials describe design elements tied to the Dye architectural legacy, including railroad-tie bulkheads, angled lay-back walls above waterlines, and vertical drywood accents in bunker faces and key fairway lines. Those details were reported in the September 16, 2026 project announcement from The First Call. In practice, these features can do more than decorate a hole. They can sharpen the player’s perception of a hazard, frame a preferred angle, or make a safe line appear narrower than it is.
At Triple Stick Golf Club, the use of those edges appears especially relevant because the plan retains existing lakes. Railroad-tie bulkheads and angled walls can turn a waterline into a clear strategic boundary. They also create strong visual contrast in flat South Florida terrain, where small changes in grade may not read as strongly from the tee. For golfers, the likely test is not only whether to challenge water, but whether the visual pressure changes club choice or target selection.
Bunkers, Waste Areas, And South Florida References
The planned bunkers are described as having flat bottoms and native tufted grasses around them. That combination can produce a clean hazard floor with rougher, more textured edges. The flat bunker bottom is significant because it suggests a more consistent stance and lie inside many bunkers, while the surrounding grasses may create less predictable recovery conditions for misses that do not quite reach the sand.
The planned expansive waste areas are also notable. The materials describe a blend of sand, shell, and screenings, with stylistic references to classic South Florida courses of the 1960s and 1970s. That is a design cue with both visual and playing implications. Waste areas can widen the apparent scale of a hole, give players a sandy recovery option outside formal bunkers, and reduce the sense that every miss is either rough or water. Without the final course rules and local designations, it would be unwise to assume exactly how each sandy area will be treated during play.
Practice, Turf, And Clubhouse Planning

Triple Stick Golf Club Surfaces
The turf plan calls for Bimini Bermuda on tees, fairways, and rough, with TifEagle on greens. The stated aim is consistency and resilience under South Florida conditions. Turf selection is not a cosmetic line item. It affects ball roll, recovery shots, mowing programs, and how the course responds to heat, humidity, rain, and wear.
Bimini Bermuda across tees, fairways, and rough suggests a unified grassing strategy for the long-game surfaces. TifEagle greens point toward a putting surface selected for warm-season performance. The research does not provide mowing heights, green speeds, firmness targets, or maintenance budgets, so the playing texture cannot be judged in full. Still, the grassing plan indicates that the redesign is being paired with agronomic choices rather than relying only on new shapes and hazards.
Practice Areas And Member Flow
The practice upgrades are planned to include an expanded driving range, a dedicated short-game area, and comfort stations placed around the property. Those details matter because a members-only club is used differently from a resort course that depends heavily on one-time play. Members tend to repeat holes, practice between rounds, host guests, and judge the facility by daily convenience as much as by one standout hole.
A dedicated short-game area is especially relevant if the course uses flat-bottom bunkers, waste areas, native grasses, and firm-edged water hazards. Players benefit from being able to rehearse the shots that the course asks for repeatedly: low pitches, bunker exits, awkward lies in grass, and controlled wedge carry distances. For additional insights and coverage related to the venue, don’t miss checking out Sports Wire News, a sister site in the same network.
The 2028 Clubhouse Phase
The planned clubhouse is described as an 11,000-square-foot structure designed by Peacock + Lewis, influenced by Island and Old Florida architectural styles. The published program includes dining with covered al fresco seating, a pro shop, and locker rooms. Because completion is scheduled for 2028, the golf course and clubhouse timelines should be viewed as related but not identical phases.
That separation can affect the early member experience. A course may open before every social and service component is complete, depending on project phasing. The supplied research does not specify interim clubhouse arrangements, membership capacity, or operating policies, so those areas remain uncertain from the available record.
Triple Stick Golf Club Design Takeaways
The planned upgrades point to a project built around three connected ideas: preserve the site’s established water framework, give the course a stronger architectural identity, and shift the former Estates Course into a more private member setting. The most concrete design signals are the retained lakes, Dye-influenced edges, flat-bottom bunkers, mixed waste areas, warm-season turf selections, par-5 finishes on both nines, and expanded practice facilities.
The open questions are just as useful for serious golfers and course observers. Yardages, green sizes, bunker counts, slope and rating, walking policy, and final member operations were not included in the supplied research. Until those details are published, the best evidence-based reading is that the redesign is intended to be strategic and visually assertive without abandoning the existing site structure.

